Fox Creek Golf Course Lake Rehabilitation – $486,000

In November 2016, ICAN was awarded the Fox Creek Lake renovation.  With a nonfunctional OCS, ICAN will remove and replace the entire pipe system for the facility, as well as the overflow.

The project consist of:

  • Demolition
  • Erosion Control
  • Grading
  • Dredging
  • Outlet control piping
  • CIP Concrete
  • Asphalt Cart Paths
  • DOT Haul roads
  • Asphalt Roadway
  • Landscaping
  • Reinforced Turf