Murphey Chandler Bridge – $260,000

In May of 2016, ICAN was selected to replace and construct a damaged bridge connecting the trail system at Murphey Chandler Park.

Project consist of:

  • Removal of Existing 120 foot Pedestrian Bridge
  • Helical Deep Foundation System
  • Abutments
  • New 120 foot Steel Pedestrian Bridge
  • Concrete Trail
  • Erosion Control
  • Granite Retaining Walls