Willeo Trail Bull Sluice Phase – $2,500,000

In September of 2015, ICAN was selected to construct the Willeo Trail Bull Sluice.  With a project value over 2.5 million, the City of Roswell looks for this to be a signature project in the southeast.

The Project consist of:

  • 3200 LF of elevated boardwalk over flood waters of the Chattahoochee River
  • Helical Piers
  • 40 Foot Steel Bridge
  • Overlooks
  • Pavilion
  • Concrete Trails
  • Erosion Control
  • Silt Curtains